摘要:本毕业设计为XX学院学生宿舍H栋投标文件。该工程总建筑面积12015平方米,居住户数211户。建筑层数地上为18层,建筑高度为54.45米。本毕业设计建筑耐火等级为二级,设计使用年限为50年,抗震设防烈度为6度,建筑工程类别为二类高层,结构形式为剪力墙结构,造价为13072896元。
该投标文件的编制是以XX学院学生宿舍H栋的施工设计图纸,现行的国家有关规范、规程、标准、规定和当地有关法规、条例及规定为依据。本次毕业设计遵循《建筑抗震设计规范》、《建筑结构荷载规范》、《建筑桩基设计规范》等,使用《重庆市建筑工程计价定额(2008)》。
本次毕业设计中采用了手工算量和电子算量两种方法,用到了广联达钢筋抽样软件,广联达图形算量软件和广联达计价软件。在设计过程中,遇到了很多的困难。手算阶段,在构件做法和钢筋算法不清楚时,我需要查阅图集或是向老师同学请教。在软件算量阶段,绘图中遇到问题,我选择上网看教学视频或向他人请教,套定额时,定额错误,老师也细心指出并指导我改正。
通过这次毕业设计,我的手算水平得到较大的提高,对软件操作也更加熟悉和深入,也接触到以前没有遇到过的问题,我获益匪浅。现在我基本能够独立完成一个工程的算量。毕业设计锻炼了我寻找方法、解决问题的能力。在以后的工作中,问题会源源不断的出现,学会查阅图集规范等资料独立解决问题是非常必须和必要的。
关键词:投标 编制依据 工程量
ABSTRACT:The graduation design is Chongqing City Management College Student Dormitory Building H. The total construction area are 12,015 square meters, 211 households lived. There are 18 floors on the ground floor, building height are 54.45 meters. The fire resistance rating is second construction rate, the design life is 50 years, seismic fortification intensity is 6 degrees, construction category is II level, structure in the form is wall structure. The cost is 13072896 Yuan.
The tender documents are compiled based on the construction contract and construction design drawings of Chongqing City Management College Student Dormitory Building H, the existing relevant national norms, procedures, standards, regulations and relevant local laws, rules and regulations as the basis. The graduation based on "Seismic Design of Buildings", "building structures norms", "building pile foundation design", used "Chongqing Construction Engineering denominated fixed(2008)".
The graduation design uses the hand-count and the electronic count the amount and Glodon steel sampling software, Glodon graphics software, Glodon price software. There are many difficulties in the design process. Hand calculation stage, when member practices and reinforcement algorithm is not clear, I need to ask the teacher or the students. Software calculation stage, there are many drawing problems, I chose to read online instructional videos or advice to others, set a fixed time, fixed take the error, the teacher carefully noted and guide me to correct.
With this graduation, my hands budget level is greatly improved, the software operation is also more familiar and in-depth, but also access to previously encountered problems, I benefited a lot. Now I'm basically able to finish a project count the amount. The graduation exercised my capability of find ways to solve problems. In future work, the problem may appear endless, learn inspection Atlas specifications and other information to solve problems independently is very essential and necessary.
Keywords: Bidding; Code and Standard; Quantity.