摘要:本工程以石柱南宾镇专业市场综合楼位于石柱南宾镇为实例,建筑面积为1327m^2、建筑层数3层,结构型式为钢筋混凝土框架,合同工期160天。

   先根据老师给定的设计图纸和施工的条件,我们完成了工程量的计算,在进行了施工组织的设计工作。施工组织设计是组织工程施工总的指导性文件,根据本工程自身的特点进行施工组织的设计,其相应的内容包括了工程的概况,主要的施工技术方案,各项资源的调配,工期的计划,施工质量和环境保护措施。

   模板专项设计是指支承新浇筑混凝土的整个系统。模板支架立柱的计算;制定模板安装和拆除程序和方法;编制模板及配件的规格、数量汇总表和周转使用计划;编制模板施工安全、防火技术措施及设计、施工说明书。

   SAP2000是一种结构有限元分析的结构分析软件,我们学习并应用它来进行模板专项设计中支架立柱构件的稳定性验算,验算结果符合要求。

关键词:施工组织设计 模板专项设计 稳定性验算

 

ABSTRACT:This works to the stone pillars Nanbin professional market complex in the town of stone Nanbin town for instance, construction area of 1327m2, building layers 3 layers of reinforced concrete frame structure type, contract duration 160 days.

   According to the teacher first given design drawings and construction conditions, we completed the engineering calculations, during the construction organization design work. Construction organization design is to organize construction general guidance documents, according to its own characteristics of the project for the construction organization design, and its corresponding content includes an overview of the project, the main construction technology program, the allocation of resources, the duration of the plan quality of construction and environmental protection measures.

   Template special design means that supporting New Concreting entire system. Template support column calculations; develop template installation and removal procedures and methods; preparing templates and accessories specifications, quantity and turnaround summary tables use plan; preparation of template construction safety, fire safety measures and technical design, construction manual.

   SAP2000 is a structural finite element analysis of structural analysis software, we learn and apply it to carry out a special design template support column component stability checking, checking the results meet the requirements.

Key words: Construction design;Special design templateS;tability Checking