摘要:该投标文件的编制是以重庆城市管理职业学院新校区后勤职工宿舍的施工合同以及施工设计图纸,根据国家及地方建筑要求,合理施工,注重时间安排和施工质量,在确保工期的前提下按质按量地完成。本工程拟定工期为190个日历天。

   本工程为重庆城市管理职业学院新校区后勤职工宿舍,所在地为重庆市沙坪坝区大学城。该工程的建设单位为重庆市管理职业学院,工程由中国大地建筑事务所设计院有限公司设计,本工程为砖混结构,结构层数为六层,工程是为了给职工提供休息的场所,为保障用房质量,应当严格按照图纸及施工规范进行施工。 

   为了能尽早满足建筑的实际用处,安排人员尽早使用,如果我方有幸能够中标,我们将完全遵照国家及地区标准及要求合理施工,按质按量的完成,保证所有的施工流程及施工工艺都符合现代化及标准化的要求,最大化的完成要求。 

关键词:质量要求 工程性质 工程用途 承诺 

 

ABSTRACT:This project for the new campus of Chongqing city management vocational college logistics worker dormitory, is located in Chongqing shapingba  district university city. The project construction unit for the chongqing vocational college management. Engineering design by China architecture & design institute co., LTD. This project is a brick structure. Structure layer of six layers, the structure is safe for secondary grade, site type for the second class. Structure design reference period T = 50 years. Seismic importance classified as class c building earthquake-resistant, fortification intensity is 6 degrees.

    The bid documents of the new campus of vocational college logistics is in chongqing city management of dormitory construction contract and the construction design drawings, according to national and local building requirements, reasonable construction, pay attention to the time schedule and construction quality, in quantity and under the premise of ensure the construction period to complete. This project proposed the construction period is 190 calendar days.

   In order to meet the actual use of buildings, as soon as possible to arrange personnel to use as soon as possible, once we won the bid, company will be fully scheduling of people, goods, content, actively promote application of new technologies, new processes, new materials, new equipment, in strict accordance with the ISO9002 quality system running. To carry out the construction technical specification, operating rules, the implementation of total quality management. Elaborate organization and scientific management, to ensure that all the commitments to achieve goals

Keywords:  Quality requirements ;Engineering properties ;Use; Guarantee